28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 6.1 Mixing Head Position Check
3 - 81
3
Figure 3-38 Location of Adjustment/Alignment Tools
d. Load Mixing Head Alignment Tool in Position # 4 of Rack and Place Rack on Left End of
Platen.
Place Rack Guide
Alignment Tool
with Cutout Up
and Facing Left
SL-243
# 4
Mixing Head
Alignment Tool
Mixing
Paddle