![background image](http://html1.mh-extra.com/html/abbott/cell-dyn-3000/cell-dyn-3000_troubleshooting-manual_3323084157.webp)
28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.6 X-Axis Solenoid to Guide Rod Check
3 - 32
3
Figure 3-12 X-Axis Sensor Flags
5. If Platen is installed:
a. Perform
“VP - 3.10 X-Axis Solenoids to Platen Channel Check” (Page 3-43)
first, then con-
S L -2 5 6
F la g
F la g
[C E M A R K ]
[N O N C E - M A R K ]