28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURES
3.1 OVERVIEW
3 - 3
3
3.1 OVERVIEW
This chapter contains:
•
Interrelationship Matrix
•
Adjustment and Alignment Procedures (called Verification Procedures) for the Sample Loader
(Type E, F and G)
The Interrelationship Matrix identifies the Alignments and Adjustments (VPs) required when various
parts are replaced. For example, if the Laser Shield is replaced,
, and
should be performed in the order indicated by the number in the VP column.
Verification Procedures ensure something is aligned, adjusted, and working the way it should.
Usually it is checked first, then adjusted or aligned if the check is incorrect or questionable.
--- END ---