28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 6.1 Mixing Head Position Check
3 - 79
3
e. Place straight edge on platen against Beam Block and confirm Mixing Assembly is parallel
with the straight edge (
).
, Mix Head Alignment Check.
• If not OK, go to
“VP - 6.2 Mixing Head Position Adjustment” (Page 3-85)
Figure 3-37 Mixing Head Vertical Check
Platen Surface
SL-241
Ensure Paddle
is Parallel to
Ruler
Beam
Block
Ruler or
Straightedge