![background image](http://html1.mh-extra.com/html/abbott/cell-dyn-3000/cell-dyn-3000_troubleshooting-manual_3323084264.webp)
3 Nov 1997
22:36
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 10.2 Tube Positioning Arm Alignment
3 - 139
3
7. Adjust energized arm length.
[NON-CE MARK] F Loader
a. Loosen clamp slightly to slide solenoid (
).
b. Adjust solenoid until check OK (
).
All Other Loaders
a. Add/Remove Shims (
) behind Solenoid Mount.