Manually Configuring Region to Region Replication
93
Manually
Configuring Region
to Region
Replication
For multi-site configurations with 2 Regions, each region contains a
replicated copy of the other region's database.
For example, consider a multi-site configuration with two regions, Region
1 and Region 2. Each region has two Authentication and Directory server
databases.
■
R1DB is the primary database located on Region 1.
■
R2DB’ is Region 2’s replicated database located on Region 1
■
R2DB is the primary database located on Region 2.
■
R1DB’ is Region 1’s replicated database located on Region 2.
This section provides instructions on how to install a replicated VCX
Authentication and Directory server database.
1
Install the Region 2 VCX Authentication and Directory server database
(R2DB’) on the VCX Authentication and Directory server for Region 1.
a
Log on as
cworks
on the primary Region 1 VCX Authentication and
Directory server and enter these commands:
cd /opt/3com/VCX/vcxdata/bin
./installVcxdata
b
Select option 2 to BACKUP ROCSA.
c
Enter the VCX Site ID of Region 2 when prompted.
The
Do you want to continue with the above settings ? [n/y]
prompt appears.
d
Enter
y
.
2
Install the Region 1 VCX Authentication and Directory server database
(R1DB’) on the VCX Authentication and Directory server for Region 2.
a
Log on as
cworks
on the primary Region 2 VCX Authentication and
Directory server and enter these commands:
cd /opt/3com/VCX/vcxdata/bin
./installVcxdata
b
Select option 2 to BACKUP ROCSA.
c
Enter the VCX Site ID of Region 1 when prompted.
The
Do you want to continue with the above settings ? [n/y]
prompt appears.
Summary of Contents for VCX V7000
Page 26: ...26 CHAPTER 1 VCX SYSTEM MAINTENANCE OVERVIEW ...
Page 68: ...68 CHAPTER 3 MANAGING VCX SERVERS ...
Page 78: ...78 CHAPTER 4 BACKING UP AND RESTORING A VCX CONFIGURATION ...
Page 88: ...88 CHAPTER 5 MANAGING AUTHENTICATION AND DIRECTORY SERVICE DATABASES ...
Page 100: ...100 CHAPTER 6 MANUALLY CONFIGURING MULTI MASTER REPLICATION ...
Page 140: ...140 CHAPTER 8 MANAGING UNINTERRUPTIBLE POWER SUPPLIES ...
Page 250: ...250 APPENDIX B UPGRADING VCX SERVER SOFTWARE FROM V7 1 X TO V7 1 Y ...
Page 290: ...290 APPENDIX C UPGRADING VCX SERVER SOFTWARE FROM V6 0 TO V7 0 ...
Page 328: ...328 APPENDIX D DOWNGRADING VCX SERVER SOFTWARE ...
Page 339: ...CLI Command Descriptions 339 ...