Upgrading a Single-Site System With Two Servers
175
6
After completing the Adhoc Conferencing, UPS Monitoring, and Global
Voicemail Integration prompts, the server reboots. When the reboot
process has been completed, the system starts VCX 7.1.
x
services.
After the system has completed the restart process, verify that the
upgrade has occurred by entering this command:
ls -l /opt/3com/VCX
The symbolic link (VCX) should point to the new version of the VCX
software (7.1.
x
c). If the link does not point to the new version, wait a few
minutes and reenter the command. This could take several minutes and it
is important the link pointer is correct before proceeding.
Example Output
/opt/3com/VCX -> /opt/3com/VCX.7.1.
x
c
7
Stop the Authentication and Directory service by entering the following
commands:
cd /opt/3com/VCX/scripts/rc3.d
./S20vcxdata stop
Upgrading the
Secondary VCX
Server
Follow the steps in this section to upgrade the secondary VCX server.
1
To start the upgrade process, enter these commands on the secondary
VCX server:
cd /opt/installtemp
tar xvf vcx-all-7.1.
x
c.tar
cd upgrade-7.1.
x
c
./install-upgrade
The system may prompt you to confirm that a new operating system
version will be installed and indicates which disk partition will be used
after the upgrade. If you see such a prompt, answer
y.
The system displays several status messages. The last two messages are:
------------------- Installation Completed Successfully -------------------
------------------- VCX version 7.1.
x
c is now available -------------------
2
Switch to the new software version by entering the following command:
vcx-switchversion 7.1.
x
c
The system displays several status messages and provides prompts that
allow you enable Adhoc Conferencing and UPS Monitoring.
Summary of Contents for VCX V7000
Page 26: ...26 CHAPTER 1 VCX SYSTEM MAINTENANCE OVERVIEW ...
Page 68: ...68 CHAPTER 3 MANAGING VCX SERVERS ...
Page 78: ...78 CHAPTER 4 BACKING UP AND RESTORING A VCX CONFIGURATION ...
Page 88: ...88 CHAPTER 5 MANAGING AUTHENTICATION AND DIRECTORY SERVICE DATABASES ...
Page 100: ...100 CHAPTER 6 MANUALLY CONFIGURING MULTI MASTER REPLICATION ...
Page 140: ...140 CHAPTER 8 MANAGING UNINTERRUPTIBLE POWER SUPPLIES ...
Page 250: ...250 APPENDIX B UPGRADING VCX SERVER SOFTWARE FROM V7 1 X TO V7 1 Y ...
Page 290: ...290 APPENDIX C UPGRADING VCX SERVER SOFTWARE FROM V6 0 TO V7 0 ...
Page 328: ...328 APPENDIX D DOWNGRADING VCX SERVER SOFTWARE ...
Page 339: ...CLI Command Descriptions 339 ...