![Watkiss DigiVAC Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/watkiss/digivac/digivac_service-manual_3694152066.webp)
60
Watkiss DigiVAC Service Manual - Issue 2 - 29/11/04
Service Procedures
•
Tower B Top Module & Two-Tower DigiVAC Systems
3.11.4 Replacing the Tower B Top Module Conveyor Belts
Should the Top Module conveyor belts become worn or damaged, they will
need to be replaced.
Procedure
1. Disconnect the DigiVAC from the mains power supply.
2. Remove the tower link assembly from the Tower B top module (see Sec-
3. Loosen the six fixing screws and remove the top cover from the top mod-
ule.
4. Open the rear door. Remove the two fixing screws and open the deflector
assembly.
5. Remove the top module tensioner plate (see Section 3.1.4).
Figure 3:53
6. Uncouple the top conveyor main drive shaft from the top module drive
shaft. Draw the top module drive shaft back through the flanged bearing
until it is clear of the top conveyor main drive shaft.
7. Remove the four lower conveyor assembly fixing screws from beneath the
top module. Carefully extract the top conveyor main drive shaft and lower
conveyor assembly from the top module. Place the lower conveyor assem-
bly on a suitable work surface.
8. Disengage the top divert belts and remove the main drive shaft from the
top conveyor assembly.
9. Remove the e-clips, spacer washers and plastic bearings from the L/H ends
of the two tower link assembly divert shafts.
10. Remove the e-clip and nylon spacer from the L/H end of the tower link
assembly pivot shaft. Withdraw the L/H pivot shaft and steel spacer tube
from the end of the pivot shaft.
11. Remove the inner e-clip and nylon washers from the pivot shaft.
12. Using a plastic mallet, gently tap the end of the pivot shaft and drive the
flanged bearing out of the R/H side plate.
13. Push all of the unfastened shafts towards the R/H side plate of the top
divert bracket and disengage them from the L/H side plate. Remove the
four conveyor belts by slipping them over the L/H ends of the shafts.
14. Replace the conveyor belts with four new ones and reassemble the
machine in the reverse order to the removal procedure. Ensure that all
removed e-clips are replaced with new ones.
15. Test machine.
PARTS REQUIRED
TOOLS REQUIRED
914-484 Conveyor Belts x 4
180-302 8mm E-clips x 4
3mm Allen Key
4mm Allen Key
Plastic Mallet
Top Conveyor Main Drive Shaft
Top Module Drive Shaft
Lower Conveyor Assembly
Tower Link Assembly Divert Shafts
Tower Link Assembly Pivot Shaft
Содержание DigiVAC
Страница 16: ...10 Watkiss DigiVAC Service Manual Issue 2 29 11 04 Overview Fuses...
Страница 136: ...130 Watkiss DigiVAC Service Manual Issue 2 29 11 04 Trouble Shooting...
Страница 140: ...134 Watkiss DigiVAC Service Manual Issue 2 29 11 04 Appendix...
Страница 141: ......