![Watkiss DigiVAC Скачать руководство пользователя страница 130](http://html1.mh-extra.com/html/watkiss/digivac/digivac_service-manual_3694152130.webp)
124
Watkiss DigiVAC Service Manual - Issue 2 - 29/11/04
Installation
•
Installing a Second Tower
11. If ancillary equipment is to be used with the system, connect it to Tower
A and switch it on. Check that the mimic updates.
12. Load some test paper into selected bins on both towers. Select the chosen
paper path and run a Test Set. Check that each set is fed correctly and that
the sets are merging together.
Note
. There may be a small amount of shale between the sheets in the final
set. This is normal and should not be considered a problem.
13. Run some more sets and check that they are passing through the conveyor
cleanly and exiting the system to a good and consistent quality.
14. Thoroughly test the system.
Содержание DigiVAC
Страница 16: ...10 Watkiss DigiVAC Service Manual Issue 2 29 11 04 Overview Fuses...
Страница 136: ...130 Watkiss DigiVAC Service Manual Issue 2 29 11 04 Trouble Shooting...
Страница 140: ...134 Watkiss DigiVAC Service Manual Issue 2 29 11 04 Appendix...
Страница 141: ......