Installing Flash IRMS Elemental Analyzer
Installing the Reactors into the Furnaces
62
EA IsoLink IRMS System for CNSOH Operating Manual
Thermo Scientific
Figure 61.
Introduction of the Combustion Reactor into the Right Furnace (3)
4. Finger-tighten the reactor retaining nut until it starts to grip the coupling union.
5. Use the coupling union fixing tool and the 32-mm wrench to tighten the retaining nut.
See
.
Figure 62.
Introduction of the Combustion Reactor Into the Right Furnace (4)
6. To complete the operation manually screw the fixing nut of the autosampler. See
.
Figure 63.
Reinstall MAS Plus Autosampler
7. Close the furnace compartment with the protecting plate and the front cover.
Retaining Nut
Coupling Union
32-mm Wrench
Coupling Union Fixing Tool
CAUTION
Use appropriate pressure to obtain a good sealing
(1/4 to 1/2 turn). Do not overtighten
the retaining nut to avoid reactor damaging.
Nut