![Thermo Scientific EA IsoLink IRMS System Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/thermo-scientific/ea-isolink-irms-system/ea-isolink-irms-system_operating-manual_1105021081.webp)
3
Installing Flash IRMS Elemental Analyzer
Making the Gas Supply Plumbing Connections
Thermo Scientific
EA IsoLink IRMS System for CNSOH Operating Manual
53
Making the Gas Supply Plumbing Connections
This section provides instructions for making the gas supply plumbing connections.
Building the Gas Lines
Building the gas supply lines from the supply cylinders to the elemental analyzer includes connecting
the gas lines to the supply tanks and installing any traps or filters on the line.
To properly connect the gas lines to the gas tanks, you will need the following materials:
• 1/8-in. in diameter (gas lines longer than 3 m [10 ft]
• 1/8-in. stainless steel tubing, properly cleaned
• a 1/16-in. stainless steel tubing, properly cleaned (for the last couple of meters to the instrument)
• a tubing cutter
• connecting nuts and relevant ferrules, reducing pieces 1/8-in. to 1/16-in.
• two wrenches
Use the following procedure to connect regulators and tubing to the gas supply tanks:
To regulate and connect tubing
1. Make sure the initial supply valves are turned off.
2. Connect the regulator to the gas supply tank. Use an open-ended wrench or adjustable wrench to
tighten the regulator connection.
3. Determine the length of tubing you need. Use only enough tubing to connect the instrument to
the gas cylinders, but allow enough slack in case the instrument should be moved at least 40 cm
(16 in.) from other equipment. This allows enough room to perform system maintenance.
4. Use a tubing cutter to cut the tubing.
Purging Gas Lines
We recommend to purge the lines any time you make a cut in the tubing during the gas line assembly
process. This will clear them of any debris from the cut. You should also purge the completely
assembled gas lines before you connect the gas supply to the EA IsoLink IRMS System for CNSOH.
Use the following procedure to purge the gas lines:
To purge the gas lines
1. Turn the gas supply on, and set the pressure to 35 kPa (0.35 bar).
2. Allow the line to purge for 10 minutes.
3. Turn off the gas supply.
WARNING
Secure gas cylinders to an immovable structure or wall. Handle all gases according to
local safety regulations.