AFA4000/2
Airflow Monitor / p.62
Side view
Front view
Figure 32: Rack and pinion sash drive motor assembly
Note: Ensure that the rack is long enough to protrude through the top of the motor
assembly, when the sash is fully closed.
4.
When the motor drive assembly is fixed to the fume hood the T-bar should be fixed
to the rack and offered up with the sash frame.
5.
Ensure that the rack is free to move over the full sash opening before marking up and
fixing the T-bar to the sash frame.
Note: The rack must to run vertically at 90º to the horizontal axis of the sash frame.
Содержание AFA4000/2
Страница 1: ...AFA4000 2 Airflow monitor Installation and operating manual Issue 1 ...
Страница 50: ...AFA4000 2 Airflow Monitor p 50 Figure 21 AFA4000 2 typical connection diagram ...
Страница 51: ...AFA4000 2 Airflow Monitor p 51 Figure 22 AFA4000 2 AS typical connection diagram ...
Страница 52: ...AFA4000 2 Airflow Monitor p 52 5 4 Dimensions Figure 23 AFA4000 2 and AFA4000 2 AS dimensions ...
Страница 53: ...AFA4000 2 Airflow Monitor p 53 Figure 24 SM7 airflow sensor dimensions ...
Страница 64: ...AFA4000 2 Airflow Monitor p 64 Figure 34 Side views of a rack and pinion drive typical installation ...
Страница 87: ...AFA4000 2 Airflow Monitor p 87 Figure 61 Adjusting the personnel sensor beam angle away from the fume hood ...
Страница 90: ...AFA4000 2 Airflow Monitor p 90 6 10 Auto Sash System Control Box general wiring diagram ...
Страница 127: ...AFA4000 2 Airflow Monitor p 127 ...
Страница 140: ...AFA4000 2 Airflow Monitor p 140 Figure 69 Typical connection diagram ...
Страница 144: ...AFA4000 2 Airflow Monitor p 144 Figure 70 Connection diagram with RS232 485 converter ...