BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.395
7.9.45. D
ISASSEMBLING THE DOUBLING CABLE
Figure 7.9.45-1
Follow the steps described in paragraphs 7.9.24.
“Disassembling the rear guard”, 7.9.25.
“Disassembling the central guard” and 7.9.43.
“Disassembling the weight stack frame guard”.
1. Unscrew the 2 dowels
a
, using a 4-gauge
hexagonal T-wrench.
2. Remove the cable with the aid of a pair of
pliers.
Figure 7.9.45-2
3. Remove the pressed end of the DOUBLING
CABLE from the slot on the doubling
support.
To reassemble the DOUBLING CABLE, follow
the above steps in reverse order.
When the operation is complete, adjust
the DOUBLING CABLE tension as
described in paragraph 8.7. .
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......