BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.397
7.9.47. D
ISASSEMBLING THE WEIGHT STACK FRAME PULLEYS
Figure 7.9.47-1
Follow the steps described in paragraph 7.9.43.
“Disassembling the weight stack frame guard”.
1. Remove the snap ring
a
on both sides, using
the special pliers provided.
2. Use a pushing tool to push the
b
inside.
3. Remove the PULLEYS, being careful with
the 2 plastic spacers.
The cable holder is fastened to the frame
by the dowel d, which may be removed
using a 3-gauge hexagonal T-wrench.
To reassemble the PULLEYS, follow the above
steps in reverse order.
For easier reassembly of the PULLEY, it
may be necessary to loosen the cable
tension.
When the operation is complete, adjust
the cable tension as described in
paragraph 8.4. .
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......