BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.78
To replace the SECONDARY SHAFT and its
components, follow the above steps in reverse
order.
To reassemble the components of the
SECONDARY SHAFT, align the punch
on a tooth of the pinion with the hole in
the cam.
When the operation is complete, adjust
the alignment and tension of the
PRIMARY SHAFT-SECONDARY
SHAFT CHAIN as described in
paragraphs 8.11. and 8.12. .
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......