BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.120
7.3.33. D
ISASSEMBLING THE SECONDARY SHAFT
Figure 7.3.33-1
Follow the steps described in paragraphs 7.3.28.
“Disassembling the weight stack frame guard”,
7.3.29. “Disassembling the weight stack cable”
and 7.3.31. “Disassembling the primary shaft -
secondary shaft chain”.
1. Loosen the 2 counter-nuts
a
and tighten the 2
setting screws
b
of the SECONDARY
SHAFT using a 17-gauge wrench.
2. Use a 4-gauge wrench to unscrew the 17
screws
c
.
3. Remove the SECONDARY SHAFT.
To disassemble the components of the
SECONDARY SHAFT, place it on a bench or
flat surface. Then:
To remove the bearings
d
and
e
:
1. Use a 2-gauge T-wrench to unscrew the 3
dowels
f
of the bearings.
2. Remove the bearings.
Figure 7.3.33-2
To disassemble the cam
g
:
1. Remove the bearing
d
.
2. Unscrew the screw
h
fastening the cable
holder, using an 8-gauge hexagonal T-
wrench.
3. Unscrew the screw
i
fastening the cam hub,
using an 8-gauge hexagonal T-wrench.
4. Remove the cam.
For easier removal of the cam, we
recommend unscrewing the 3 screws I
fastening the cam to the pinion, using a
6-gauge hexagonal T-wrench.
To disassemble the pinion
m
:
Continued on next page
→
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......