BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.160
7.4.31. D
ISASSEMBLING THE PRIMARY SHAFT
-
SECONDARY SHAFT CHAIN
Figure 7.4.31-1
Follow the steps described in paragraph 7.4.30.
“Disassembling the bell”.
1. Move the CHAIN until the coupling link
a
is
placed on the primary shaft crown
b
.
2. Release the spring clamp
c
of the coupling
link using the pliers provided.
3. Remove the coupling plate
d
.
4. Remove the coupling link.
5. Remove the CHAIN.
To reassemble the CHAIN, follow the above
steps in reverse order.
To position the CHAIN correctly, adjust
the cam phasing and lever mechanism as
described in paragraph 8.2. .
When the operation is complete, adjust
the alignment and tension of the
PRIMARY SHAFT-SECONDARY
SHAFT CHAIN as described in
paragraphs 8.11. and 8.12. .
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......