-Shenzhen Guanhong Automation Co.,Ltd.-
SZGH-CNC1000MDb Series
- 191 -
Chapter 8 Installation & Connection
8.1 System Installation
At first, users should check whether the hardware is complete, unwound and compatible.
The installation of cnc system must be fastened tightly, with some spaces around to ensure the
ventilation of air. Panel should be put in a place where it is not only convenient to operate and but
also able to avoid hurt of heating by scrap iron.
Intense current, week current must be put separately, cnc system and driver should be possibly
away from the machine intense current. In order to reduce interference, all signal cables should be
kept away from AC contactor. Photoelectric encoder, limit, basic point signal are advisably not to be
connected directly to cnc system through intense current box. All power cords must be earthing.
8.2 System installation dimension
This system has two parts of cnc controller, host controller & operational panel
Fig8.2 Dimension of A type & B type Operational Panel
Fig3.1 Dimension of Host Controller
Содержание SZGH-CNC1000MDb Series
Страница 220: ...Shenzhen Guanhong Automation Co Ltd SZGH CNC1000MDb Series 207 Appendix I Wiring Diagram of CN3 Plug...
Страница 221: ...Shenzhen Guanhong Automation Co Ltd SZGH CNC1000MDb Series 208 Appendix II Wiring Diagram of CN10 Plug...
Страница 222: ...Shenzhen Guanhong Automation Co Ltd SZGH CNC1000MDb Series 209 Appendix III Wiring Diagram of CN4 Plug...