Install a Power Supply
Listen for the audible click when the power supply fully seats.
4.
Reconnect the power cord to the power supply.
5.
Verify that the amber LED on the replaced power supply and the service required
LEDs are not lit.
6.
Log in to the ILOM service processor as root.
Refer to the ILOM 3.0 documentation for instructions.
7.
At the ILOM prompt (
->
), type the
show /SYS/PS
n
command to verify the status of
the power supplies.
In this command,
PS
n
is the identifier for the power supply you plan to remove, either
PS0
or
PS1
.
Related Information
■
“Rear Panel Cable Connections” on page 17
■
“Power Supply LEDs” on page 23
■
“Remove a Power Supply” on page 184
188
Sun Netra X4270 Server • September 2015
Содержание Sun Netra X4270
Страница 1: ...Sun Netra X4270 Server Service Manual Part No E23171 03 September 2015 ...
Страница 2: ......
Страница 10: ...10 Sun Netra X4270 Server September 2015 ...
Страница 12: ...12 Sun Netra X4270 Server September 2015 ...
Страница 36: ...36 Sun Netra X4270 Server September 2015 ...
Страница 72: ...72 Sun Netra X4270 Server September 2015 ...
Страница 100: ...100 Sun Netra X4270 Server September 2015 ...
Страница 224: ...224 Sun Netra X4270 Server September 2015 ...
Страница 230: ...WDT W WDT watchdog timers 230 Sun Netra X4270 Server September 2015 ...
Страница 237: ...Index V video port location 17 pinout 219 visual notification 29 W watchdog timer setting 50 weight of server 80 237 ...
Страница 238: ...238 Sun Netra X4270 Server September 2015 ...