Replacing the Battery
11.
Install the PCI mezzanine.
“Install the PCI Mezzanine” on page 104
12.
Install the air duct.
“Install the Air Duct” on page 130
13.
Return the server to operation.
“Returning Server to Operation” on page 211
14.
After replacing the faulty ESM, clear the server fault.
Refer to the ILOM 3.0 documentation for more information about the following steps.
a.
Use the ILOM CLI to log in to the server as
root
and type the following
command to list all known faults on the server:
->
show /SP/faultmgmt
The command lists all known faults, for example:
->
show /SP/faultmgmt
Targets:
0 (/SYS/ESMR/ESM)
Properties:
Commands:
cd
show
b.
Type the following command to clear the fault.
->
set /SYS/ESMR/ESM clear_fault_action=true
For example:
->
set /SYS/ESM clear_fault_action=true
Are you sure you want to clear /SYS/ESMR/ESM (y/n)?
y
Set ???clear_fault_action” to ???true???
Replacing the Battery
The battery maintains system time when the server is powered off and a time server is
unavailable. If the server fails to maintain the proper time when powered off and not connected
to a network, replace the battery.
Replacing Motherboard Assembly Components
157
Содержание Sun Netra X4270
Страница 1: ...Sun Netra X4270 Server Service Manual Part No E23171 03 September 2015 ...
Страница 2: ......
Страница 10: ...10 Sun Netra X4270 Server September 2015 ...
Страница 12: ...12 Sun Netra X4270 Server September 2015 ...
Страница 36: ...36 Sun Netra X4270 Server September 2015 ...
Страница 72: ...72 Sun Netra X4270 Server September 2015 ...
Страница 100: ...100 Sun Netra X4270 Server September 2015 ...
Страница 224: ...224 Sun Netra X4270 Server September 2015 ...
Страница 230: ...WDT W WDT watchdog timers 230 Sun Netra X4270 Server September 2015 ...
Страница 237: ...Index V video port location 17 pinout 219 visual notification 29 W watchdog timer setting 50 weight of server 80 237 ...
Страница 238: ...238 Sun Netra X4270 Server September 2015 ...