Surge Arrestors
Surge Arrestors
Please refer to
"Surge Arrestors and Suppliers"
in
Appendix A, "Field Replaceable
for more information.
Lightning arrestors should be installed to transport lightning strikes away from the equipment.
Install a lightning rod on a tower leg other than the leg to which you mount the antenna.
Power Panel
Motorola recommends that all sites where an MTS will be installed use a standardized power panel
including circuit breaker layout. Vacant space should be left to allow for future requirements.
User Alarms, Control Outputs, and Door Alarm
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
The MTS in all con
fi
gurations has the following alarm inputs and control outputs:
•
15 x 12 V opto-isolated alarm inputs - available on the junction panel
◦
Alarm inputs and Alarm ground are
fl
oating
•
2 x Form A relay outputs with Common and Normally Open contacts -
available on the junction panel
•
DOOR alarm - connected to the Site Controller
All 15 alarm inputs and Door alarm are using the same Alarm Ground. All these alarms
and controls are connected directly to the Site Controller (SC).
The Expansion Cabinet only offers the Door alarm feature.
For detailed information refer to
in
and
"User Alarms/Controls, X.21, RGPS, and GPS Cabling"
in
Chapter 5, "Interconnection and Internal Cabling"
.
.
See
for more detailed description of User Alarms input structure.
6802800U74-N September 2009
3-21
Содержание DIMETRA MTS 2
Страница 4: ...This page intentionally left blank ...
Страница 28: ...List of Procedures This page intentionally left blank xxii 6802800U74 N September 2009 ...
Страница 30: ...List of Processes This page intentionally left blank xxiv 6802800U74 N September 2009 ...
Страница 46: ...Cooling Fans Chapter 1 MTS Overview This page intentionally left blank 1 12 6802800U74 N September 2009 ...
Страница 52: ...Battery Safety Chapter 2 General Safety This page intentionally left blank 2 6 6802800U74 N September 2009 ...
Страница 146: ...Screws Chapter 4 Hardware Installation Figure 4 59 MTS 4 Screws Positions 4 70 6802800U74 N September 2009 ...
Страница 148: ...Screws Chapter 4 Hardware Installation This page intentionally left blank 4 72 6802800U74 N September 2009 ...
Страница 348: ...Base Radio Restoration Chapter 10 Base Radio This page intentionally left blank 10 12 6802800U74 N September 2009 ...
Страница 360: ...PSU TrackID Update Chapter 11 Power Supply Unit This page intentionally left blank 11 12 6802800U74 N September 2009 ...
Страница 474: ...Configuration Chapter 15 Expansion Options This page intentionally left blank 15 44 6802800U74 N September 2009 ...
Страница 476: ...Introduction Chapter 16 MTS 4 Outdoor Enclosure This page intentionally left blank 16 2 6802800U74 N September 2009 ...
Страница 486: ...This page intentionally left blank A 10 6802800U74 N September 2009 ...
Страница 492: ...This page intentionally left blank B 6 6802800U74 N September 2009 ...
Страница 496: ...This page intentionally left blank C 4 6802800U74 N September 2009 ...