Receiver Verification Procedure
This procedure provides commands and responses to verify proper operation of the Base Radio receive path.
The Bit Error Rate (BER) measurement meets speci
fi
cations at less than 0.01% (1.0e-02%) to pass the process.
Procedure 6-9
How to Verify the Receiver
1
Switch on the power of the Base Radio.
2
Enter the Test Application mode and login.
Contact your local Motorola representative or Technical Support to obtain password.
3
At the prompt, type:
freq -orxch1
. This command displays the receive frequency for the current
Base Radio. Record the result.
To set the receive frequency, use the command
freq -orx_all -fXXX.XXXX
.
For example, to set the receive frequency to 401.0125MHz, type
freq -orx_all
-f401.0125
.
4
Use following commands to change TX and RX frequency if necessary. If you read the frequency
you want to use in the previous step, skip this step:
•
freq -otx_all -f394.0125
•
freq -orx_all -f384.0125
5
Type
sge -orx_all -son
and press
Enter
to enable system gain alignment.
6
At the prompt, type:
ptm -orx_all -mTCH_72 -s15 -tMulti_Frame_Trigger
–d-6
.
For Stabilock 4031/4032 use single slot only and delay 0:
ptm -orx_all -mTCH_72 -s8 –tFrame_Trigger –d0
It may be necessary to adjust the trigger delay set by the -d option.
7
At the prompt, type:
enable -orxch1 -dbr1 -son
. This command enables the receiver branch
under test and should enable br1, br2, or br3 respectively depending on the branches that you
are testing.
8
Set the signal generator to generate a T1 signal and inject to the relevant antenna port.
6802800U74-N September 2009
6-27
Содержание DIMETRA MTS 2
Страница 4: ...This page intentionally left blank ...
Страница 28: ...List of Procedures This page intentionally left blank xxii 6802800U74 N September 2009 ...
Страница 30: ...List of Processes This page intentionally left blank xxiv 6802800U74 N September 2009 ...
Страница 46: ...Cooling Fans Chapter 1 MTS Overview This page intentionally left blank 1 12 6802800U74 N September 2009 ...
Страница 52: ...Battery Safety Chapter 2 General Safety This page intentionally left blank 2 6 6802800U74 N September 2009 ...
Страница 146: ...Screws Chapter 4 Hardware Installation Figure 4 59 MTS 4 Screws Positions 4 70 6802800U74 N September 2009 ...
Страница 148: ...Screws Chapter 4 Hardware Installation This page intentionally left blank 4 72 6802800U74 N September 2009 ...
Страница 348: ...Base Radio Restoration Chapter 10 Base Radio This page intentionally left blank 10 12 6802800U74 N September 2009 ...
Страница 360: ...PSU TrackID Update Chapter 11 Power Supply Unit This page intentionally left blank 11 12 6802800U74 N September 2009 ...
Страница 474: ...Configuration Chapter 15 Expansion Options This page intentionally left blank 15 44 6802800U74 N September 2009 ...
Страница 476: ...Introduction Chapter 16 MTS 4 Outdoor Enclosure This page intentionally left blank 16 2 6802800U74 N September 2009 ...
Страница 486: ...This page intentionally left blank A 10 6802800U74 N September 2009 ...
Страница 492: ...This page intentionally left blank B 6 6802800U74 N September 2009 ...
Страница 496: ...This page intentionally left blank C 4 6802800U74 N September 2009 ...