MTS 2 and MTS 4 Installation, Con
fi
guration and Basic Service Manual
Final Check-out
Final Check-out
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
The
fi
nal check-out procedure consists of:
•
Final check-out setup
•
Expansion Cabinet power-up
Final Check-out Setup
After the completion of the MTS installation, perform
. This
fi
nal check-out
procedure ensures the proper operation of the MTS.
Procedure 4-15
How to Perform the Cabinet Final Check-out Setup
1
Switch to OFF the Power Supply Unit.
2
Verify that the connections on all modules and on the junction panel are secure and make good
contact. Make any necessary adjustments.
3
If a backup battery is used, check if the wires on plus (+) and minus (-) poles make good contact
and if appropriate, check that the temperature sensor is attached.
Expansion Cabinet Power-Up
Cabinet power-up procedure is arranged to prevent MTS damage in the case of an
equipment or installation defect.
Make certain the switch on the Power Supply Unit is switched OFF before
proceeding. Turn switch to ON only when directed in below procedure.
Procedure 4-16
How to Power-Up MTS and Expansion Cabinet
1
Check connections at Power Supply Unit and if applicable at the backup battery.
2
Set switch to ON position.
3
Watch the following LED indicators to monitor the PSU inputs and outputs during the startup
procedure:
6802800U74-N September 2009
4-63
Содержание DIMETRA MTS 2
Страница 4: ...This page intentionally left blank ...
Страница 28: ...List of Procedures This page intentionally left blank xxii 6802800U74 N September 2009 ...
Страница 30: ...List of Processes This page intentionally left blank xxiv 6802800U74 N September 2009 ...
Страница 46: ...Cooling Fans Chapter 1 MTS Overview This page intentionally left blank 1 12 6802800U74 N September 2009 ...
Страница 52: ...Battery Safety Chapter 2 General Safety This page intentionally left blank 2 6 6802800U74 N September 2009 ...
Страница 146: ...Screws Chapter 4 Hardware Installation Figure 4 59 MTS 4 Screws Positions 4 70 6802800U74 N September 2009 ...
Страница 148: ...Screws Chapter 4 Hardware Installation This page intentionally left blank 4 72 6802800U74 N September 2009 ...
Страница 348: ...Base Radio Restoration Chapter 10 Base Radio This page intentionally left blank 10 12 6802800U74 N September 2009 ...
Страница 360: ...PSU TrackID Update Chapter 11 Power Supply Unit This page intentionally left blank 11 12 6802800U74 N September 2009 ...
Страница 474: ...Configuration Chapter 15 Expansion Options This page intentionally left blank 15 44 6802800U74 N September 2009 ...
Страница 476: ...Introduction Chapter 16 MTS 4 Outdoor Enclosure This page intentionally left blank 16 2 6802800U74 N September 2009 ...
Страница 486: ...This page intentionally left blank A 10 6802800U74 N September 2009 ...
Страница 492: ...This page intentionally left blank B 6 6802800U74 N September 2009 ...
Страница 496: ...This page intentionally left blank C 4 6802800U74 N September 2009 ...