Process 8-7
How to Configure Redundant Site Controllers
1
Perform Site Controller Hardware Pre-Checks, as described in
Procedure 8-26, "Site Controller
Hardware Pre-Checks," on page 8-47
.
2
Con
fi
gure the Site Controller Con
fi
guration Files, see
Procedure 8-27, "Site Controller
3
Con
fi
gure Ethernet ports connecting the two Site Controllers, as described in
gure Ethernet Ports," on page 8-48
4
Con
fi
gure the ID values of the Site Controllers, see
.
Procedure 8-26
Site Controller Hardware Pre-Checks
1
Ensure that both SCs are correctly installed and are running identical software applications,
Boot images and con
fi
guration
fi
les.
2
In order for the Redundant Site Controller feature to work correctly, the Site Controller and
BR Boot1 version must be:
•
TSC_RLJ_BOOT1–R06.40.07 or later for Site Controller.
•
BRC_RLJ_BOOT1–R06.40.05 or later for Base Radio.
The Boot1 version can be checked on the Site Controller and BRs by using the
ver
command on both the Site Controller and on the Base Radio.
3
Check that the redundant Site Controller Ethernet Link cables are connected correctly, as shown
in Figure 5–6.
4
Proceed to
below.
Procedure 8-27
Site Controller Configuration Files
In order to check that the Site Controller con
fi
guration
fi
les have the Standby Site
Controller Installed parameter enabled, follow the steps below.
1
Log onto the Site Controller Application MMI.
2
From the SC: prompt, run the command
display config
.
3
Check the output of the con
fi
guration and con
fi
rm if the Standby SC parameter is enabled or not.
4
If no Standby Site Controller is enabled, upload the Active Site Controller con
fi
guration
fi
le.
5
Modify the con
fi
guration
fi
le in TESS to enable Standby Site Controller.
6
Download the new con
fi
guration
fi
le to the InActive Bank (set to use as next after reset).
7
Reset the Site Controller.
8
Con
fi
rm the con
fi
guration is correct.
6802800U74-N September 2009
8-47
Содержание DIMETRA MTS 2
Страница 4: ...This page intentionally left blank ...
Страница 28: ...List of Procedures This page intentionally left blank xxii 6802800U74 N September 2009 ...
Страница 30: ...List of Processes This page intentionally left blank xxiv 6802800U74 N September 2009 ...
Страница 46: ...Cooling Fans Chapter 1 MTS Overview This page intentionally left blank 1 12 6802800U74 N September 2009 ...
Страница 52: ...Battery Safety Chapter 2 General Safety This page intentionally left blank 2 6 6802800U74 N September 2009 ...
Страница 146: ...Screws Chapter 4 Hardware Installation Figure 4 59 MTS 4 Screws Positions 4 70 6802800U74 N September 2009 ...
Страница 148: ...Screws Chapter 4 Hardware Installation This page intentionally left blank 4 72 6802800U74 N September 2009 ...
Страница 348: ...Base Radio Restoration Chapter 10 Base Radio This page intentionally left blank 10 12 6802800U74 N September 2009 ...
Страница 360: ...PSU TrackID Update Chapter 11 Power Supply Unit This page intentionally left blank 11 12 6802800U74 N September 2009 ...
Страница 474: ...Configuration Chapter 15 Expansion Options This page intentionally left blank 15 44 6802800U74 N September 2009 ...
Страница 476: ...Introduction Chapter 16 MTS 4 Outdoor Enclosure This page intentionally left blank 16 2 6802800U74 N September 2009 ...
Страница 486: ...This page intentionally left blank A 10 6802800U74 N September 2009 ...
Страница 492: ...This page intentionally left blank B 6 6802800U74 N September 2009 ...
Страница 496: ...This page intentionally left blank C 4 6802800U74 N September 2009 ...