CHAPTER 3.0 Wiring and Installation
3-41
CDS7324 (FORMERLY LSF-0819)
Rev. A
INSTALLATION & USER’S MANUAL
3.10.2.5 Size
E
PE
PE (J9.9)
M o t o r
U2 (J9.10)
V2 (J9.11)
g r o u n d i n g o f s h i e l d
v i a c o n n e c t o r c l a m p
W2 (J9.12)
V
W
U
grounding of shield
via connector clamp
(or RF connection to
ground screw in
case of terminal board)
J9
DS2110 E
Figure 3.34 DS2110 E Motor Power Connection
J9
-
Fixed connector: 4 pole, screw terminal
-
E size wiring: cable 1 AWG (42 mm
2
)
-
Stripping Length 24mm
-
Tightening Torque: 8Nm
Pos. Name Function
J9.9
PE
Motor Protective Earth
J9.12 W2
Motor
Phase
W
J9.11 V2
Motor
Phase
V
J9.10 U2
Motor
Phase
U
Table 3. -19 J9, Motor connector, E Size
Содержание DS2110
Страница 15: ...CHAPTER 1 0 Overview 1 11 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL Page Intentionally Blank...
Страница 192: ...CHAPTER 5 0 Functional Overview 5 70 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL Page Intentionally Blank...
Страница 261: ...APPENDIX B GUI B 63 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL...
Страница 266: ...APPENDIX B GUI B 68 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL Page Intentionally Blank...
Страница 310: ...APPENDIX G ETHERNET MEZZANINE CARD G 9 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL...