APPENDIX D – MEZZANINE CARD INSTALLATION
D-1
CDS7324 (FORMERLY LSF-0819)
Rev. A
INSTALLATION & USER’S MANUAL
Introduction
To expand the functionality of the DS2110, various fieldbus options are available on mezzanine cards. This document covers the
installation of the mezzanine cards in the DS2110.
Installation
1.
For size A-E power stages remove the M3 * 8mm Torx screw at the bottom of the drive, connecting the control stage to the
power stage. Gently disconnect the ribbon cable from the connector on the control card.
2.
For uA size power stages remove the M3 * 8mm Torx screw at the top and bottom of the drive, connecting the control stage
to the power stage. Gently disconnect the ribbon cable from the connector on the control card.
3.
Remove the mezzanine card from the anti-static metallised bag; ensure that ESD precautions are observed.
4.
Place the mezzanine card on to the host card, gently pushing the connectors together until the mezzanine card rests evenly
on the four stand-offs attached to the host card.
5.
Use the 4 M2.5 * 6mm Torx screws provided, with 4 washers, to secure the mezzanine card to the host controller. Torque
to
6.
Place the overlay provided with the mezzanine card centrally on the bottom of the control stage enclosure. This indicates
the connectors and/or LEDs for the various mezzanine cards.
7.
Replace the control stage on the power stage using either 1 or 2 M3 * 8mm Torx screws removed earlier.
Host control card.
Mezzanine card.
Ribbon cable connector.
M2.5 * 8mm Torx
screws and washers.
WARNING
–
If the installation is being carried out in the field then power down and
disconnect the DS2110 from the supply
voltage and wait 5 minutes before installing
the mezzanine card.
The mezzanine card is sensitive to damage from static electricity. Ensure correct
anti-static procedures are observed (e.g. use properly installed earth straps etc.)
before installation or removal of a mezzanine Card.
Содержание DS2110
Страница 15: ...CHAPTER 1 0 Overview 1 11 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL Page Intentionally Blank...
Страница 192: ...CHAPTER 5 0 Functional Overview 5 70 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL Page Intentionally Blank...
Страница 261: ...APPENDIX B GUI B 63 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL...
Страница 266: ...APPENDIX B GUI B 68 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL Page Intentionally Blank...
Страница 310: ...APPENDIX G ETHERNET MEZZANINE CARD G 9 CDS7324 FORMERLY LSF 0819 Rev A INSTALLATION USER S MANUAL...