4 - 22
⑤
Handling of the 3-point linkage
①
④
③
⑤
②
⑥
⑦
Down speed control knob
Fast
Slow & lock
▶
The parts of 3-point linkage are
very heavy. When handling
them, take care not to get injury.
PLEASE BE CAREFULL !
Caution
When driving the tractor without attached implement, comply with the followings.
1. Connect upper link(5) to the fixing hook installed in front of the upper link.
2. Connect stabilizer(2) to the lower link(3) to avoid the lateral movement of the lower link.
3. Connect lower link strap to the both lower links(3) (if fitted, chain type stabilizer only)
If the 3-point linkage is not necessary, remove it as follows.
1. Remove upper link pin(7) and upper link(5).
2. Detach the rear side of the stabilizer(2) from the lower link(3) while holding the lower link tightly
not to fall down.
3. Remove lift rod (LH), lift rod (RH) and stabilizer(2) step by step.
4. Remove lower link(3) carefully not to get hurt due to its own weight.
When using hitch/drawbar, or driving on the road,
lift up the 3-point linkage and fix it by turning the
down speed control knob to the locking position.
①
Lift rod (LH)
②
Stabilizer
③
Lower link
④
Lift rod (RH)
⑤
Upper link
⑥
Lift rod pin
⑦
Upper link pin
Содержание MT230E 2020
Страница 1: ...LS TRACTOR OPERATOR S MANUAL MT230E MT235E MT240E ...
Страница 2: ......
Страница 14: ......
Страница 60: ......
Страница 70: ......
Страница 108: ......
Страница 138: ...4 30 Front wheel track 7 14 4PR with rim disk W5x14 Unit mm inch 1115 43 9 in 1207 47 5 in Standard track ...
Страница 142: ...4 34 Attaching points for Front end loader When attaching the front end loader refer to the drawings as below ...
Страница 151: ...5 3 Identification markings Metric hex bolt head 1 Manufacturer s identification 2 Property class GS 8 8 1 2 ...
Страница 213: ...6 1 6 Dimension and Specification 4WD model Unit mm Front tires 7 14 4PR Rear tires 11 2 24 8PR ...
Страница 218: ......