4 - 20
①
Upper link installation and
adjustment
Select a suitable attaching hole(2) depending on
the implement.
Adjust the length of the upper link with turning
the sleeve(4) after loosening the locking nut (3).
Fasten the locking nut (3).
Adjustment range: 430~654mm (16.9~25.7 in)
②
Adjustment of lift-rod (Left/Right)
For lift rod (LH), detach the upper side from the
lift arm and adjust the length by turning the
upper side (1).
Adjustment range: 492~502mm (19.4~19.8 in)
For lift rod (RH), turn the handle(4) to the right to
shorten the rod. If turning it to the left, the rod is
elongated. After adjustment, tighten the locking
nut(3).
Adjustment range: 445~538mm (17.5~21.2 in)
If assembling the lower link to the upper hole of
the lift rod, it can additionally shorten the length
by 63mm(2.5 in).
▶
Insert snap-pin(6) firmly to prevent the upper link pin(5) from being escaped.
Notice
▶
Do not adjust the length of the upper link over the maximum limit. It may cause
fatal injury or death by falling object.
Caution
▶
Do not adjust the length of the lift-rod over the maximum limit. It may cause fatal
injury or death by falling object.
Caution
⑥
④
②
⑤
③
Upper link
④
③
①
②
Содержание MT230E 2020
Страница 1: ...LS TRACTOR OPERATOR S MANUAL MT230E MT235E MT240E ...
Страница 2: ......
Страница 14: ......
Страница 60: ......
Страница 70: ......
Страница 108: ......
Страница 138: ...4 30 Front wheel track 7 14 4PR with rim disk W5x14 Unit mm inch 1115 43 9 in 1207 47 5 in Standard track ...
Страница 142: ...4 34 Attaching points for Front end loader When attaching the front end loader refer to the drawings as below ...
Страница 151: ...5 3 Identification markings Metric hex bolt head 1 Manufacturer s identification 2 Property class GS 8 8 1 2 ...
Страница 213: ...6 1 6 Dimension and Specification 4WD model Unit mm Front tires 7 14 4PR Rear tires 11 2 24 8PR ...
Страница 218: ......