Installation
Piping Connections
Refer to Tables 39 and 40 and Figures 48 and 49 for
flow rate and capacity.
The steam piping must enter the unit through the floor
of the heat section compartment. The access doors to
the compartment are gasketed so the compartment can
be sealed. However, as added protection for condensate
leakage into the space, the piping access holes should
be sealed with a heat resistant mastic. The following
figure illustrates the location of the compartment and
piping connections.
Piping access holes should be sealed
with a heat resistant mastic to prevent
damage to equipment.
FIGURE 31 – HOT WATER PIPING CROSS-SECTION
LD14189
DO NOT use tin based solder. Braz
-
ing with tin based solder could cause
equipment damage or possible injury
to tenants of the structure that is being
conditioned.
Содержание 40 25 TON
Страница 22: ...22 JOHNSON CONTROLS 5276178 JIM C 0118 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 35: ...35 2 JOHNSON CONTROLS 5276178 JIM C 0118 FIGURE 10 PARTIAL ROOF CURB MODEL 1RC0455P LD14177 ...
Страница 41: ...41 2 JOHNSON CONTROLS 5276178 JIM C 0118 FIGURE 18 40 TON FORWARD CURVE EXAMPLE ...
Страница 159: ...159 JOHNSON CONTROLS 5276178 JIM C 0118 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 244: ...244 JOHNSON CONTROLS 5276178 JIM C 0118 Service NOTES ...