INS-27
DUAL, TRIPLE, POKER DC Inverter : 4. Installation
Multi Liberty
DC Inverter
c) Temporarily fix the decorative panel to Indoor Unit’s body, by screwing for about 5 mm the 4 providec
bolts M5 x 16, after inserting the corresponding washer on each bolt.
d) Horizontally adjust the position of the decorative panel, so as to centre it as regards the hole cut in
the false ceiling.
e) Screw or unscrew each bolt till the decorative panel is perfectly horizontally positioned, and till the
thickness of insulation spongy material placed between the panel and the Indoor Unit’s body, is reduced
to 4 ~ 6mm, as it is shown in the following Figure.
m
There must be no gap between the panel and the false ceiling. In case of gaps, some problems may
occur as it is shown in the Figure below (humidity condensation on false ceiling, with consequent water
dripping inside the room).
m
If after fastening the panel’s bolts thoroughly, there is still a gap between inside surface of decorative
panel and false ceiling, it is needed to adjust again the installation height of Indoor Unit. This is possible
by simply removing the 4 corners of panel and by adjusting the Indoor Unit’s below suspension nuts,
reachable through the holes beneath the corner.
m
When adjusting the Indoor Unit’s installation height again, it is needed to keep the Unit perfectly
horizontally, so as not to cause problems to condensate drain system. Example: inverted slope. This
problem is shown in the Figure below.
Unit’s body
False ceiling
Air inlet
Insulation material
Panel
Flap
Panel’s insulation
material
Panel’s insulaiton
material
Outlet air
Insulation
material
Fig.10
Water dripping
False ceiling
Gap
Fig.11
False ceiling
Hexagonal nut
Horizontal adjustment
Fig.12