INS-4
DUAL, TRIPLE, POKER DC Inverter : 4. Installation
Multi Liberty
DC Inverter
4.1 CHECKS AND PRELIMINARY OPERATIONS
¦
Before starting the installation work, be sure to have all necessary tools and materials for carrying out all different
phases of procedures.
¦
Check if there are all accessories sold together with Units, and then buy on site all necessary accessories and
components which are not sold with the appliance.
n
Tools and components necessary for installation (not exhaustive list):
Screw drivers
(flat and cross-shaped)
Drill
Tape measure
Cutter
Gas leakage
detector for R410
and liquid soap
Thermometer
Allen keys
(4 and 5mm)
Assembly and
disassembly.
Making holes for
fixation plugs.
Check of gas leakages.
Inlet and outlet
temperature on
Indoor Unit.
Opening and closing
of service valves.
Wall cutter
(65mm diameter)
Fork wrench and
adjustable
spanner
Digital or analogue
multimeter
Isolation
resistance meter
Roller pipe cutter
Electrical cables
Protection
cover
Rubber pads
Pipe clips
Adhesive
Flexible drain
hose
Refrigerant pipings
Putty
Vinyl adhesive
tape
IR Remote Controls
Finishing of wall
hole (I.U. side)
For taping cables
and pipings.
Wiring between
Units.
Absorption of
vibrations (O. U.).
Fixing of cables
and pipes.
Finishing.
For draining
condensate.
Making holes into
the wall.
Pipe connection
tightening.
For measuring
resistance, voltage
and current.
Spirit level
Gas leak detector lamp
Metre: for measuring
length/distance
Cutter: cutting of
plastic bands.
For cutting of pipings.
For deburring of rims.
Prevention of
electric shocks.
Torque wrench
Connection tightening.
Piping connections
between Units.
For covering O.U.
(when it is not used)
DO NO
T USE
WITH
R410A
Deburring
tool
Amperometric pliers
Thermometric sensor
Tester
R51I4/BGE
(HKEU X)
R11HG/E
(HTFU X, HRBU X)
R51D/E
(HFIU X)
R05/BGE
(HSFU X)