GE H
EALTHCARE
D
IRECTION
FC091194, R
EVISION
11
V
IVID
7 S
ERVICE
M
ANUAL
5 - 98
Section 5-4 - Back-End Processor (BEP)
5-4-10
UPS Battery Description
The UPS Battery is used in these Back-End Processors:
•
BEP1
•
BEP2.0
•
BEP2.2
•
BEP4 used as BEP2.2 Replacement
•
BEP4 used as BEP2.0 and BEP1 Replacement
The UPS batteries provide power to the Back-End Processor to enable a controlled shut down of the
processor.
NOTE:
It is not possible to use the Vivid 7 for scanning or any other useful work without the mains
power. The UPS battery is only used as a power source for the BEP so it can do a controlled
shut down, or be in standby modus without AC Mains Power connected for a limited period of
time, maximum 15 minutes.
Figure 5-58 Battery Block Diagram
Figure 5-59 Battery Pack
In Line
20A Fuse
Battery 1
Battery 2
Compression tape used to
minimize battery pack movement
while installed in chassis
Heat-shrink holds batteries together
and insulates terminals.
Spacer
seperates
batteries
+
-
-
+
Label to be
attached to
this surface
In line 20A fuse
Содержание Vivid 7
Страница 1: ...GE Healthcare Operating Documentation Vivid 7 Service Manual Part Number FC091194 Revision 11...
Страница 2: ......
Страница 9: ...GE HEALTHCARE DIRECTION FC091194 REVISION 11 VIVID 7 SERVICE MANUAL vii JA ZH CN KO...
Страница 37: ...GE HEALTHCARE DIRECTION FC091194 REVISION 11 VIVID 7 SERVICE MANUAL xxxv Site Log 10 27 Index Index 1...
Страница 38: ...GE HEALTHCARE DIRECTION FC091194 REVISION 11 VIVID 7 SERVICE MANUAL xxxvi...
Страница 856: ...GE HEALTHCARE DIRECTION FC091194 REVISION 11 VIVID 7 SERVICE MANUAL Index 8...
Страница 857: ......