GE H
EALTHCARE
D
IRECTION
5461425-8EN, R
EVISION
B
RIVO
XR118 S
ERVICE
M
ANUAL
Chapter 5 - - Installation & Configuration
Page 61
Section 7.0
System Power Up
1.) Plug the Switching Power Supply and monitor power cable into hospital main power (If
required).
2.) The dock and AP automatically boot up.
3.) Press the power button of the monitor.
4.) Press the power button on the image workstation > 2 seconds to power up the workstation.
5.) Press the power button on the image detector > 2 seconds to power up the detector.
Note:
Do Not unplug the image workstation from the dock.
Содержание Healthcare Brivo XR118
Страница 4: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 4 Legal Notes ...
Страница 46: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 46 ...
Страница 134: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 134 Section 14 0 Installation Checklist ...
Страница 164: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 164 Chapter 7 Brivo XR118 System Check ...