GE H
EALTHCARE
D
IRECTION
5461425-8EN, R
EVISION
B
RIVO
XR118 S
ERVICE
M
ANUAL
Page 40
Section 2.0 - Installation Handoff Checklist
General
Completed
1.) Walls and floor clear of all obstructions?
2.) Walls finished?
3.) Finished floor installed?
4.) Room lights installed?
5.) Dust-creating work completed?
6.) Old equipment within room removed?
7.) Component positions clearly marked on floor?
8.) Space available to store equipment?
9.) Lock on door, or locked room available?
10.) Room IP Addresses for DICOM and Broadband identified?
11.) Broadband connection provided for InSite connection?
12.) Have all fire/safety inspections for occupancy been completed?
13.) Send completed checklist to the GE Healthcare installation team.
Comments:
Inspection Date(s):
Installation Project Manager Signature
Содержание Healthcare Brivo XR118
Страница 4: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 4 Legal Notes ...
Страница 46: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 46 ...
Страница 134: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 134 Section 14 0 Installation Checklist ...
Страница 164: ...GE HEALTHCARE DIRECTION 5461425 8EN REVISION 6 BRIVO XR118 SERVICE MANUAL Page 164 Chapter 7 Brivo XR118 System Check ...