FR500A&FR510A Series Vector Control Inverter
- 99 -
Figure 6-12 Pulse operation stop control diagram
Press SB1, inverter forward operation, press SB1 again inverter stop; Press SB2, inverter reverse
operation, press SB2 again, inverter stop.
Press the SB1 button inverter run clockwise, press the SB1 button to stop the SB2 button is
pressed again converter; inverter reverse operation, press the SB2button to stop again inverter.
F04.16
Terminal UP/DOWN frequency
adjustment treatment
Range:00000
~
11111
Default:00000
Unit's place: action when stop
0: Clear
Terminal UP/DOWN frequency adjustment value is cleared when the drive stops.
1: Holding
Terminal UP/DOWN frequency adjustment value is maintained when the drive stops.
Ten's place: action on power loss
0: Clear
Terminal UP/DOWN frequency adjustment value is cleared in case of power loss.
1: Holding
Terminal UP/DOWN frequency adjustment value is saved in case of power loss.
Hundred's place: integral function
0: No integral function
Adjustment step size is kept constant during terminal UP/DOWN adjustment, in compliance with
F04.17.
1: Integral function enabled
When frequency is adjusted through terminal UP/DOWN, initial step size is set by F04.17.
With the effective lasting time of the terminals, adjustment step size will increase gradually.
Thousand’s place: UP/DOWN frequency adjust selection
0: Can’t be reduced to negative frequency
When adjusted by terminal UP/DOWN, frequency can’t be reduced to negative value
1:Can be reduced to negative frequency
When adjusted by terminal UP/DOWN, frequency can be reduced to negative value
Ten thousand’s place: Jog function to clear UP/DOWN
0: Not clear
1: Clear
F04.17
Terminal UP/DOWN
frequency change step size
Range:0.00
~
50.00Hz
Default:1.00Hz/200ms
It is used to adjust the rate of change of frequency when the frequency is adjusted by means of
terminal UP/DOWN.
F04.18
Power on running terminal
action selection
Range: 0
~
1
Default: 0
It is only valid to running command terminal which is set in number 1,2,4,5(Running forward,
running reverse, JOG forward, JOG reverse), and only valid for the first running after power on.
0: Electrical level effective
When terminal is given running command, running terminal is detected to be ON, inverter start to
run. Please ensure the terminal statue before power on.
FWD
↑
↑
Operation
command
FWD
Stop
REV
↑
↑
Operation
command
REV
Stop