Liquiline System CA80SI
Commissioning
Hauser
47
4. Using the SPx sample inlet hoses, connect the channels of the panel with the sample
channel switching to the pressure relief valves of the panel. Keep the length of hose
between the pressure relief valves and the panel with the sample channel switching
as short as possible: max. 1 m (3.28 ft).
5. Connect sample inlet hose SPx of the sample channel switching to the push-in
connector upstream from the flowmeter. In the process, guide the sample inlet hose
into the housing via a hose gland.
6. Plug in the connector of the panel with the sample channel switching.
9.1.5
Connecting the outlet hose "W"
1-channel, 2-channel and 4-/6-channel version
The liquid from outlet hose "W" of the cuvette contains reaction mixture. Observe the
local regulations regarding waste disposal.
‣
Secure outlet hose "W" to the appropriate connector nozzle in a PG gland. Avoid
counterpressure.
9.1.6
Placing the magnetic stir bar in the measuring chamber of the
cuvette
Before operating the analyzer, you must insert the magnetic stir bar supplied into the
cuvette.
1.
Remove the cover.
2.
Remove outlet hose "W".
Содержание Liquiline CA80SI
Страница 2: ......
Страница 172: ...www addresses endress com 71593680 71593680 ...