STATUS PSM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
LCP
STATUS PSM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
LCP
LCP
LCP
STATUS SDM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
STATUS SDM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
LCP
STATUS DAM
DEV
SVS ST
NET ST
AUX
LINK/ACT
X1
X2
X3
PS
M
5
10
PS
M
5
10
SD
M
5
11
SD
M
5
11
/
SD
M
51
2
D
A
M
5
10
e3
0b
h4
21
.1
1
...
...
Illustration 48: Connecting 2 PSM 510 Modules to the AC Choke
5.9.1.3 Connecting 2 PSM 510 Modules to the AC Choke with System Splitting
Connect the PSM 510 modules to the same AC choke regardless of the load position (for example, before or after the system splitting)
as shown in
Ensure the choke used is the correct size based on the combined power of the PSM 510 modules.
When 2 PSM 510 modules are used, the wiring between the AC line choke and each PSM 510 must be the same length within a
tolerance of 0.5 m.
Connect each PSM 510 to the AC choke directly. Parallel wiring is not permitted.
STATUS PSM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
LCP
LCP
LCP
LCP
LCP
LCP
LCP
LCP
STATUS PSM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
STATUS SDM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
STATUS SDM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
e3
0b
h4
22
.1
0
STATUS DAM
DEV
SVS ST
NET ST
AUX
LINK/ACT
X1
X2
X3
STATUS ACM
DEV
CAP ST
NET ST
LINK/ACT
X1
X2
STATUS SDM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
STATUS SDM
DEV
SVS ST
NET ST
LINK/ACT
X1
X2
PS
M
5
10
PS
M
5
10
SD
M
5
11
SD
M
5
11
/
SD
M
51
2
SD
M
5
11
SD
M
5
11
/
SD
M
51
2
A
CM
5
10
D
A
M
5
10
EX
M
5
10
...
Illustration 49: Connecting 2 PSM 510 Modules to the AC Choke with System Splitting
Electrical Installation
Operating Guide | VLT® Multiaxis Servo Drive MSD 510 System
AQ262450196490en-000101 / 175R1170
70 | Danfoss A/S © 2019.10
Содержание VLT MSD 510
Страница 1: ...Operating Guide VLT Multiaxis Servo Drive MSD 510 System...
Страница 2: ......