Procedure
1. Open the
HW Config
tool.
2. Select the station with the PROFINET
®
devices to be involved in IRT communication.
3. Select the PROFINET
®
I/O interface in the section
Station/IO system
.
4. Select the menu [Edit
→
PROFINET IO
→
Domain management].
e3
0b
h5
26
.1
0
Illustration 88: Domain management
5. In the
Sync Domain
tab, select the station in the upper field of the
Nodes
section.
6. In the lower field of the
Nodes
section, double-click on the device that should be configured as the sync master.
7. When the
Device properties
window opens, select
Sync master
as
Synchronization role
and click on
OK
.
e3
0b
h5
27
.1
0
Illustration 89: Device properties: Sync Master
Commissioning
Operating Guide | VLT® Multiaxis Servo Drive MSD 510 System
AQ262450196490en-000101 / 175R1170
122 | Danfoss A/S © 2019.10
Содержание VLT MSD 510
Страница 1: ...Operating Guide VLT Multiaxis Servo Drive MSD 510 System...
Страница 2: ......