3
|
Components
Service manual
266
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
a
b
a
Pin 1
b
Pin 3
Is the measured voltage on the PCB
correct?
Action
Yes
PCB and continue with the next
procedure.
No
Continue with the next step.
3
Measure the output voltage on connector X601A on the inverter PCB.
Result:
The measured voltage MUST be 18 V DC.
Is the measured output voltage on the
inverter PCB correct?
Action
Yes
Correct the wiring between the fan
inverter PCB and the inverter PCB, see
361].
No
Perform a check of the inverter PCB,
see
To check the HAP LED of the fan inverter PCB
Prerequisite:
First perform a power check of the fan inverter PCB, see
1
Locate the HAP LED on the fan inverter PCB.
a
a
HAP LED
Does the HAP LED blink in regular
intervals (approximately 1 Hz)?
Action
Yes
PCB and continue with the next
procedure.
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...