3
|
Components
Service manual
340
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
c
a
b
a
Screw
b
Solenoid valve coil
c
Solenoid valve body
2
Remove the solenoid valve coil from the solenoid valve body.
3
Disconnect the solenoid valve connector from the main PCB.
4
Cut all tie straps that fix the solenoid valve harness.
5
To install the solenoid valve coil, see
339].
To remove the solenoid valve body
Prerequisite:
Recuperate the refrigerant from the refrigerant circuit, see
368].
Prerequisite:
If needed, remove any parts or insulation to create more space for
the removal.
1
Remove the solenoid valve coil, see
2
Cut the solenoid valve body pipes using a pipe cutter.
b
a
b
a
Solenoid valve body
b
Pipe
3
Remove the solenoid valve body.
4
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
5
Heat the end of the solenoid valve pipe using an oxygen acetylene torch and
remove the solenoid valve pipe end.
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...