3
|
Components
Service manual
299
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
1
Visit your local spare parts webbank.
2
Enter the model name of your unit and check if the installed spare part
number corresponds with the spare part number indicated in the webbank.
Is the correct spare part for the noise
filter PCB installed?
Action
Yes
Return to
298] of the noise filter
PCB and continue with the next
procedure.
No
Replace the noise filter PCB, see
301].
To check the wiring of the noise filter PCB
Prerequisite:
First perform all earlier checks of the noise filter PCB, see
298].
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Check that all wires are properly connected and that all connectors are fully
plugged‑in.
2
Check that no connectors or wires are damaged.
3
Check that the wiring corresponds with the wiring diagram, see
INFORMATION
Correct the wiring as needed.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
298] of the noise filter
PCB and continue with the next
procedure.
To perform an electrical check of the noise filter PCB
Prerequisite:
First check the power supply to the noise filter PCB, see
298].
1
Measure the voltage between the following output wires of the noise filter
PCB on the location shown below. All measurements MUST be 400 V AC.
▪
L1B–L2B
▪
L1B–L3B
▪
L2B–L3B
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...