3
|
Components
Service manual
239
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
b
Tie wrap
c
Ferrite core
d
Screw connections
e
Power wiring
2
Remove the necessary tie wraps from the wiring of the current sensor and the
power wiring.
3
Remove the ferrite core.
4
Loosen the screw connections to disconnect the power wiring.
5
Slide the current sensor on the power wiring and remove the current sensor.
6
To install the current sensor, see
238].
To install the current sensor
1
Slide the current sensor on the power wiring and install the current sensor in
place.
2
Install the power wiring in the connections and fasten the screws.
3
Install the ferrite core.
4
Connect the current sensor connector.
5
Install new tie wraps on the wiring of the current sensor and on the power
wiring.
a
b
c
b
b
d
e
e
a
Current sensor
b
Tie wrap
c
Ferrite core
d
Screw connections
e
Power wiring
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...