Check if communication between outdoor unit and indoor units is initialised.
Check field setting 1‑10 for count of indoor units, see
455]. If less indoor units shown than expected, communication
between 1 or more indoor unit(s) and outdoor unit is NOT correct. Check the
F1‑F2 transmission line between the indoor unit and outdoor unit, see
Possible cause:
Faulty or interruption in transmission line between indoor
units and outdoor unit.
2
Perform a test run from the outdoor unit. See installer reference guide for
more information.
3
using the error based troubleshooting, see
4
System operation is possible but leak detection function will NEVER run.
INFORMATION
If all procedures listed above have been performed and the problem is still present,
contact the helpdesk.
2.3.149 U3-03 – Test run not performed yet
Trigger
Effect
Reset
Test run NOT performed.
Unit will NOT operate.
Perform test run.
To solve the error code
INFORMATION
It is recommended to perform the checks in the listed order.
1
Check if communication between outdoor unit and indoor units is initialised.
Check field setting 1‑10 for count of indoor units, see
455]. If less indoor units shown than expected, communication
between 1 or more indoor unit(s) and outdoor unit is NOT correct. Check the
F1‑F2 transmission line between the indoor unit and outdoor unit, see
Possible cause:
Faulty or interruption in transmission line between indoor
units and outdoor unit.
2
Perform a test run from the outdoor unit. See installer reference guide for
more information.
3
using the error based troubleshooting, see
INFORMATION
If all procedures listed above have been performed and the problem is still present,
contact the helpdesk.