3
|
Components
Service manual
249
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
4
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
5
Heat the ends of the expansion valve pipes using an oxygen acetylene torch
and remove the expansion valve pipe ends.
6
Stop the nitrogen supply when the piping has cooled down.
7
To install the expansion valve body, see
To install the expansion valve body
1
Install the expansion valve body in the correct location and correctly oriented.
2
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
3
Wrap a wet rag around the expansion valve body and solder the refrigerant
pipes to the expansion valve body.
CAUTION
Overheating the valve will damage or destroy it.
4
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
a
b
a
Expansion valve body
b
Expansion valve pipe
5
To install the expansion valve motor, see
6
Add
refrigerant
to
the
refrigerant
circuit,
see
368].
To install the expansion valve motor
1
Install the expansion valve motor on the expansion valve body.
INFORMATION
Turn the expansion valve motor 1/8 turn clockwise to lock it on the expansion valve
body.
INFORMATION
The correct alignment of the expansion valve motor is ensured by dimples.
b
a
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...