3
|
Components
Service manual
224
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
a
a
a
a
Faston connector
CAUTION
Before measuring the compressor motor windings resistance, measure the
resistance of the multimeter probes by holding the probes against each other. If the
measured resistance is NOT 0 Ώ, this value MUST be substracted from the measured
winding resistance.
5
Measure the resistance between the compressor motor windings U-V, V-W
and U-W.
Result:
All measurements MUST be approximately the same.
Unit
Compressor
Winding resistance value
(at temperature of 20°C)
REYQ8~12U
M1C
0.26 Ω±5%
16
M1C + M2C
0.77 Ω±5%
20
M1C
0.77 Ω±5%
M2C
0.26 Ω±5%
Compressor motor winding
measurements are correct?
Action
Yes
Continue with the next step.
No
Replace the compressor, see
6
Connect the Faston connectors to the compressor wire terminals U, V and W
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...