Software
Crestron
D3 Pro
™
6. For Basic and Periodic schedules, select a run option. If you select
Run from
start to stop date
, then enter a Start Date and Stop Date in the text fields.
The event will occur daily at the scheduled time, including on the start and
stop dates.
If you select
Run forever
, the Stop Date will be dimmed and the event will
be fired each day at the scheduled time, starting on the Start Date.
If you select
Run annually
the event will be fired each year during the Start
Date to Stop Date period. (Here only the month and day are visible.) If the
Start Date is after the Stop Date, the event will run until the next year.
7. With Basic schedules you can select or clear specified days or months.
78
•
Crestron D3 Pro™
Reference Guide – DOC. 5998a