26-2
Cisco MDS 9000 Fabric Manager Switch Configuration Guide
OL-7753-01
Chapter 26 Configuring Domain Parameters
About fcdomain Phases
About fcdomain Phases
This section describes each fcdomain phase.
•
Principal switch selection—This phase guarantees the selection of a unique principal switch across
the fabric.
•
Domain ID distribution—This phase guarantees each switch in the fabric obtains a unique domain
ID.
•
FC ID allocation—This phase guarantees a unique FC ID assignment to each device attached to the
corresponding switch in the fabric.
•
Fabric reconfiguration—This phase guarantees a resynchronization of all switches in the fabric to
ensure they simultaneously restart a new principal switch selection phase.
Figure 26-1
Sample fcdomain Configuration
Note
Domain IDs and VSAN values used in all procedures are only provided as examples. Be sure to use IDs
and values that apply to your configuration.
Local WWN
20:02:ab:ba:cd:dc:f4:00
Configured domain ID
0 (zero) preferred
Runtime domain ID = 7
Configured priority = 128
Runtime priority = 128
Runtime fabric name
20:01:ab:ba:cd:cd:dc:f4
Local WWN
20:01:ab:ba:cd:dc:f4:00
Configured domain ID
0 (zero) preferred
Runtime domain ID = 2
Configured priority = 128
Runtime priority = 2
Runtime fabric name
20:01:ab:ba:cd:cd:dc:f4
Local WWN
20:03:ab:ba:cd:dc:f4:00
Configured domain ID
0 (zero) preferred
Runtime domain ID = 102
Configured priority = 128
Runtime priority = 128
Runtime fabric name
20:01:ab:ba:cd:cd:dc:f4
7.0.1
7.0.2
7.0.0
99.0.1
99.0.2
99.0.3
99.1.2
99.1.1
VSAN 10
79953
Switch 7 (subordinate)
Switch 99 (subordinate)
Switch 2 (principal)
Содержание DS-C9216I-K9
Страница 26: ...Contents xxvi Cisco MDS 9000 Fabric Manager Switch Configuration Guide OL 7753 01 ...
Страница 42: ...xlii Cisco MDS 9000 Fabric Manager Switch Configuration Guide OL 7753 01 New and Changed Information ...
Страница 128: ...10 8 Cisco MDS 9000 Fabric Manager Switch Configuration Guide OL 7753 01 Chapter 10 Managing System Hardware ...