9
9
9-9
9-9
Installation > Making Pre-Checks > Selecting the Site of Installation
Installation > Making Pre-Checks > Selecting the Site of Installation
Installing the Drum Unit
1) Open the front cover
F-9-11
F-9-11
2) Press the button on the right cover to open the right door.
CAUTION:
To prevent the drum unit from being
damaged, keep the right cover open
at least 5 cm during the installation
procedure.
F-9-12
F-9-12
3) Turn the lock lever as shown below to release the collected
toner container.
4) Take out the collected toner container.
F-9-13
F-9-13
5) Remove one screw from the developer pressure lever.
The screw does not exist in some machine versions by
destination.
6) Turn the lever as shown below to release the drum unit.
x1
F-9-14
F-9-14
7) Remove the drum cover. (Keep the drum cover because it
may be used later for machine relocation.)
F-9-15
F-9-15
Содержание IMAGERUNNER 2530
Страница 1: ...9 8 7 6 5 4 3 2 1 imageRUNNER 2530 2525 2520 Series Service Manual...
Страница 4: ...Blank Page...
Страница 16: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts...
Страница 111: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts...
Страница 159: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment...
Страница 166: ...6 6 Troubleshooting Troubleshooting Upgrading Targets and Procedure...
Страница 171: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code...
Страница 186: ...8 8 Service Mode Service Mode Outline Details of Service Mode...
Страница 321: ...Service Tools General Circuit Diagram Appendix...