9
9
9-79
9-79
Installation > Drum Heater-C1 Installation Procedure > Installation Procedure
Installation > Drum Heater-C1 Installation Procedure > Installation Procedure
20) Remove 1 screw to detach the blindfold cover.
Screw (1 pc.)
•
F-9-184
21) Remove the left rear cover.
Screws (3 pcs.)
x3
•
F-9-185
22) Detach all the connectors on the power supply unit and remove 3 screws to dismount the power
supply unit.
x3
F-9-186
23) Mount 2 supplied wire saddles and 1 supplied edge saddle on the rear frame.
F-9-187
Содержание IMAGERUNNER 2530
Страница 1: ...9 8 7 6 5 4 3 2 1 imageRUNNER 2530 2525 2520 Series Service Manual...
Страница 4: ...Blank Page...
Страница 16: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts...
Страница 111: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts...
Страница 159: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment...
Страница 166: ...6 6 Troubleshooting Troubleshooting Upgrading Targets and Procedure...
Страница 171: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code...
Страница 186: ...8 8 Service Mode Service Mode Outline Details of Service Mode...
Страница 321: ...Service Tools General Circuit Diagram Appendix...