9
9
9-44
9-44
Installation > Cst Heater Kit-J1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Installation > Cst Heater Kit-J1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Cst Heater Kit-J1 Installation Procedure
Checking the Contents
[5]
[6]
[1]
[2]
[3]
[4]
[7]
Unpack the shipping carton and confirm the following components are contained in the carton.
[1]
Heater PCB
1pc.
[2]
Heater SW harness
1pc.
[3]
Heater AC harness
1pc.
[4]
Heater DC harness
1pc.
[5]*1
High temperature caution label
1pc.
[6]*1
Cassette heater sheet
1pc.
[7]
Screw (RS-tight, M3x8)
1pc.
*1:These items are used only when the cassette heater is to be installed in the iR2530/2525/2520
series model with its 1st cassette capacity is 250 sheets. Save them even if the cassette heater is
not being installed.
F-9-91
F-9-91
Points to Note Before Installation
Turning Main Power OFF
CAUTION
Perform the following in the order prior to the installation.
1) Turn the main power of the host machine OFF.
2) Confirm the control panel display and the main power lamp have turned OFF
and unplug the power cord.
■
Содержание IMAGERUNNER 2530
Страница 1: ...9 8 7 6 5 4 3 2 1 imageRUNNER 2530 2525 2520 Series Service Manual...
Страница 4: ...Blank Page...
Страница 16: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts...
Страница 111: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts...
Страница 159: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment...
Страница 166: ...6 6 Troubleshooting Troubleshooting Upgrading Targets and Procedure...
Страница 171: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code...
Страница 186: ...8 8 Service Mode Service Mode Outline Details of Service Mode...
Страница 321: ...Service Tools General Circuit Diagram Appendix...